Feb 23, 2021. #1. I started my MEB officially on AUG 30, 2020. At first everything was moving along somewhat smoothly. After about 3 months of waiting for the VA to schedule my appointments (calling, emailing and leaving voicemails to my PEBLO at least once a week) I luckily met a 1SG who told me to call QTC medical and in that same 20 minute ...

Meb timeline. The MEB phase has an officially published DoD timeline of 100 calendar days for Active Component (AC) military personnel and 140 calendar days for Reserve Component (RC) …

An online A/B experiment in which semantic search was enabled for Microsoft Docs produced a significant 4.5 percent clickthrough rate increase on challenging queries (three or more words)—the largest relevance improvement the Microsoft Docs team has seen. Blog The science behind semantic search: How AI from Bing is powering Azure …

Oct 12, 2021. #1. I am at the Fort Hood. Please, comment below on your timeline and experience. August 3rd referral to start the MEB process. August 13th MED Board started, met PEBLO. Sept 1st VA Rep / filed a claim with 5 conditions. Sept 1st Commander's statement. Sept 27, Sept 29, Sept 30 C&P Exams.the MEB may recommend placing them on temporary limited duty (TLD) for a specific time frame, after which the RSM must return l to full duty. Otherwise, the RSM will be referred to the Physical Evaluation Board (PEB) phase. *The IDES Timeline follows the three phases: MEB, PEB, and Transition Phase.Oct 24, 2022 ... ... timeline, as stated in DA PAM 40-502 4-4. https://openranksnc.com/ ***** Please support our grass roots Service Project, called ...30 Apr 19 - DN2DP said potentially unfit, must perform an MEB (IDES timeline starts) 8 Jul 19 - C&P exam received from the VA by PCM 11 Jul 19 - Package completed, MEB completed, package sent to IPEB 23 Jul 19 - Found UNFIT by PEB, package sent to VA D-RAS 17 Sep 19 - Received ratings - DOD 30%, VA 90% 18 Sep 19 - Contacted OAC to discuss VARR ...PEB processing right now is taking about 3 weeks at Fort Bragg, but this also depends on the case workload and whether the PEB approves the proposed ratings. 13 January 2015 - Referral. 15 January 2015 - VA Claims. 23 February 2015 - Medical Exam. 19 March 2015 - Medical Evaluation Board. 11 May 2015 - Informal PEB.2 March 2022 - Acknowledge IRILO w/First Sergeant. 17 March 2022 - Initial Medical Board Briefing w/PEBLO. 21 March 2022 - Initial VA MSC Briefing. 2 April 2022 - First QTC appt. 6 June 2022 - Last QTC appt. 28 June 2022 - PEBLO received VA C&P exam results. 8 July 2022 - NARSUM addendum submitted by PCM.

The average used to be 270 days (9 months) from start to finish. From the timelines I have seen recently it looks to be 120-150 days. So stretching it out 17 months seems out of the question, I'm no expert and maybe someone more qualified can help. In reference to the VA exams, they are pretty cut and dry.If you are in need of differential repair, you may be wondering how long the process will take. The answer can vary depending on several factors, including the severity of the dama...Oct 26, 2023. #24. ruddnjs000 said: Sharing my timeline. May 3rd - amro Cc statement - may 18th Afpc - may 18th Afpc result - may 19th full med Meb briefing - may 30th Pre-separation (tab) form filled out - may 30th Va claims briefing - 5/31/2023 6/7/23 - va exams scheduled June 21st - Jaw July 5th - mental health July 11th - …Timeline-Installation Formerly Known as Fort Rucker. CVST_COVAX; May 13, 2023; 2 3. ... MacDilll AFB, FL (MEB through Ft. Stewart) 338reezens; Mar 24, 2024; Replies 1 ...They completed the MEB by the end of April, and the PEB started shortly afterwards. I just received my disposition a couple of days ago. (100% VA rated and medically retired) So we are looking at 10 months give or take some days. I know this is stressful, and it sucks depending on how you look at it.MEB Timeline. Thread starter Veritas1382; Start date Feb 11, 2018; Tags case timelines irilo meb V. Veritas1382 New Member. Registered Member. Feb 11, 2018 #1 Hello All, This is my first post and I thought I would share where I am with the process so far. I have had 3 back surgeries over the past 8 months.

Whether you’re a history buff or simply curious about the origins of your home, knowing its construction date can provide valuable insights into its history and character. From arc... Became a wounded warrior AFSC to ride out his time. Honestly seemed like finalizing his career through medical sep and retirement were within a few months of each other given his timeline. MEBs take about 6 months. Fight it at every level... miss MEB appointments “not feeling well, maybe COVID and need to reschedule”. How Long Will the MEB Process Last? A Timeline. On average, the MEB process takes roughly about 100 days. However, this is not definitive, meaning that some cases may take longer, while others could be resolved more quickly. Any delays in scheduling exams could add to wait times at the MEB.20 Jan 2023: VA rep released exams to PEBLO. PEBLO began working on package. 23 Jan 2023: PEBLO sent package to local board (3 docs). 30 Jan 2023: Local board agreed to continue with full MEB. Signed 618 with PEBLO acknowledging local board’s decision. 01 Feb 2023: Received myFSS email stating AFPC has received my package.MEB/PEB Timeline. Background: Joined NC Nat’l Guard in 1996, then eventually switched over to Army Reserves. AD Time: Mobilized to Ft. Jackson, SC Feb 2003 to Dec 2006. Back into Army Reserves. 92Y30. SSG. BN Supply NCOIC. Mar 2010 Told while at School (BNCOC Phase II) that I was being put thru MEB. Told to leave and …Oct 26, 2023. #24. ruddnjs000 said: Sharing my timeline. May 3rd - amro Cc statement - may 18th Afpc - may 18th Afpc result - may 19th full med Meb briefing - may 30th Pre-separation (tab) form filled out - may 30th Va claims briefing - 5/31/2023 6/7/23 - va exams scheduled June 21st - Jaw July 5th - mental health July 11th - …

24 hour fitness paramus reviews.

Apr 4, 2024 · A forum for members to post their Army case processing timelines. Threads 1.1K Messages 15.7K. Threads 1.1K Messages 15.7K 1.3K. Air Force Updates PEB Instruction- AFI36-3212 dtd 22 Feb 24. Mar 11, 2024. Provis.VETERANS BENEFITS TIMETABLE. Information for Veterans Recently Separated from Active Military Service. BENEFITS AND SERVICES. Disability Compensation: VA pays ...30 Jan 24 - NARSUM from both PCM and Mental Health sent to PEBLO ("Do not retain" from both) w/2 more DQ conditions. 1 Feb 24 - Case sent to AFPC for fitness determination. 14 Feb 24 - FL4 approved, full MEB required for both MH and PH. 15 Feb 24 - Emailed by VA MSC to initiate records review.

The Integrated Disability Evaluation System (IDES) combines both the DoD and the VA disability systems into one streamlined process to ensure that service members are able to receive their essential disability benefits as soon as possible upon separation.Soldier on Active Duty during both the Medical Evaluation Board (MEB)and P hysical Evaluation Board (PEB)(AR 40. -400 Section 1) 1-2. The process for an RC Soldier not on Active Duty, but who has conditions that are duty-related(i.e. injuries and/or illnesses incurred in the line of duty) is similar to the process for a Soldier on Active Duty.review of the MEB, the reviewer will contact you to go over the findings of the review, and then will submit the findings in writing to your PEBLO. If you then wish to submit a Rebuttal Letter to the MEB, you have five (5) calendar days to submit the letter. The rebuttal will be forwarded to the MEB convening authority for review.MEB 13 Apr 21, PEB 20 July 21, found unfit 1 Feb 2022, EAS 29 Apr 22. There is nothing more miserable than waiting. None of my stuff fell in the time line, USMC btw. Call the 18559482311 VA White House hotline number. I was fed up and they could not help me out when I called mid January, but magically my stuff was done.IDES/MEB TIMELINE. Hey everyone, I'm U.S. Army AD. This forum was very instrumental to me throughout the entire IDES process, so I figured that sharing my timeline may help answer someone's question (s) with regards to IDES/MEB/VA timeline and process. TIMELINE: 12/18/2018 - MEB initiated with three P3 profiles 12/20/2018 - …MEB Timeline so far. Medboard/IDES. 10 Aug2022- Sent to AFPC 12 Aug 2022- Full MEB notification 12 Aug 2022- Peblo brief 16 Aug 2022- Contact with VA rep 19 Aug 2022- Exams scheduled 31 Aug 2022- First Exam Mental Health 2 Sep 2022- Audiology 6 Sep 2022- Optometry 12 Sep 2022- Final exam (head to toe) 11 Oct 2022- All results are …Jan 21, 2014 ... ... MEB processing. (PEBLOs play an important ... Click on image, or see Appendix of PDF version for larger version of timeline. ... (MEB) convening ...Apr 27, 2020 ... 31 Dec 2019China reported a cluster of cases of in Wuhan, Hubei Province. A novel coronavirus was eventually identified.1 January 2020WHO ...The timeline of human history begins between 160,000 and 195,000 years ago with early modern humans, beginning with early periods, such as the Mesolithic and Neolithic. Later on, t...

I hadn’t found a recent Ft Jackson timeline on here, so hopefully this will help someone in the future. Referred condition: Low Back/Tailbone Pain (Two Sacroiliac Joint Fusions). Location: Fort Jackson, SC - MEB through Fort Gordon, GA. MEB Initiated: 16 FEB 22. PEBLO 1st Contact: 23 FEB 22. CoC Counseling: 23 FEB 22. PEBLO …

If you or a loved one require assistance with daily activities due to a disability or advanced age, the In-Home Supportive Services (IHSS) program can be a lifeline. IHSS provides ...MEB Timeline? Thread starter kynchanted; Start date Jun 12, 2018; K. kynchanted PEB Forum Regular Member. Registered Member. Jun 12, 2018 #1 Hello, I'm new to the forum and to the MEB world. I'm ADAF w/20 yrs in next month. I've been seeing neurology for chronic tension and migraine headaches since 2000, and I've been on …17 September package sent to VA. 24 September VA completed rating. 14 November PEBLO received PEB proposed decision. 25 November accepted PEB results. 11 December new EAS. 16 December submitted TERA to MMSR. 16 December MMSR4 confirms receipt. 23 December MMSR2 confirms receipt. 10 January TERA request …Mar 8, 2024. #1. Here is my timeline in hopes that we can support each other in this process! I was referred for 5 conditions (Fibromyalgia, Migraines, IBS, Bilateral plantar fasciitis, and Left wrist pain) Code 37 applied: 21 Dec 2023. NARSUM sent to AFPC: 9 Feb 2024. "Proceed with full MEB"/FL-4: 23 Feb 2024.the MEB may recommend placing them on temporary limited duty (TLD) for a specific time frame, after which the RSM must return l to full duty. Otherwise, the RSM will be referred to the Physical Evaluation Board (PEB) phase. *The IDES Timeline follows the three phases: MEB, PEB, and Transition Phase.A condition that the MEB finds to be medically unacceptable can qualify for VA disability compensation when the condition was either aggravated by active duty service or began in active duty. MEB and PEB decisions can affect your VA disability rating. If your condition is found to be medically unacceptable and you are found unfit for duty, you ...1. There is not timeline on referral. Some conditions automatically generate a MEB, others are generated by a provider based on medical retention standards fouond in the resource tab of this website. 2. Again some conditions will be treated and residuals will guide the provider to generate an MEB or not.Navy Hawaii timeline. Referred to IDES: January 19, 2023 C&P Exams Complete: March 14, 2023 MEB report Complete: July 18, 2023 Accepted by PEB for action: Aug 14, 2023 VA Claim closed: September 13, 2023 Received findings (and signed): November 8, 2023 Separation orders: November 16, 2023 EAS now 29 December, 2023...14. Messages. 71. M. please help. Dec 13, 2023. markcasiol. Medical Evaluation Board Issues early in the PDES proccess, especially the Medical Evaluation Board. Includes important decisions regarding elections, appeals and influencing the referral to the Physical Evaluation Board.

Atwoods magnolia ar.

Where is the vex incursion zone.

MEB IMCOM APPELLATE PROCESS PDA/PEB VA. IDES Timeline. Transition 26 Days. If a Soldier is found unfit for continued military service he/she must separate no later than 90 days after finalization ofthe board. This includes transition duties, orders issuance and out-processing. The IDES completion goal for the Transition phase excludes any amount The Integrated Disability Evaluation System (IDES) process is a vital component to maintaining unit readiness by ensuring those Soldiers who are no longer medically able to perform their duties are transitioned from the Army with dignity and respect. IDES Fort Liberty is here to assist Soldiers in successfully navigating the IDES process.Medical Evaluation Board (MEB) Physical Evaluation Liaison Officer (PEBLO) Temporary Disability Retirement List (TDRL) Resources. IDES Timeline Overview. Army Regulation 635-40 Disability Evaluation for Retention, Retirement, or Separation. Army Regulation 40-501 Standards of Medical Fitness.Timeline-Installation Formerly Known as Fort Rucker. CVST_COVAX; May 13, 2023; 2 3. ... MacDilll AFB, FL (MEB through Ft. Stewart) 338reezens; Mar 24, 2024; Replies 1 ...Soldiers may begin a CSP no earlier than 180-days from their separation/retirement date (not terminal leave date). The 180 days from discharge requirement is statute from 10 U.S. Code § 1143 (Employment assistance), section1143 (e) (2) (B): “A member of the armed forces is an eligible member for the purposes of a …The mutual recognition procedure is a European authorisation procedures based on the principle of recognition of the assessment by the Reference Member State (RMS). The Co-ordination Group for Mutual recognition and Decentralised procedures (CMDh) has published several Guidance documents regarding MRP and DCP.Current Ides Timeline: 24 Feb 14: Orthopedic recommends unfit for duty. 25 Feb 14: Pcm refers to MEB. 26 Feb 14: Initial intake with MSC. 27 Feb 14: Medical history screening with MSC. 28 Feb 14: Medical Evaluation with MEB. 03 March 14: MEB Demographic (Canceled) 04 March 14: MEB Briefing (Canceled) 03-05 March 14: Fort Campbell Closed due to ...Whether you’re a history buff or simply curious about the origins of your home, knowing its construction date can provide valuable insights into its history and character. From arc... ….

IDES Timeline. List of references applicable to the IDES process: AR 40-501; AR 635-40; AR DODI 1332.18; AR 635-8; AR 40-400; The Soldier IDES Dashboard is located in AKO under “My MEB” in the Medical Readiness tab and provides a means to track the individual’s IDES process. It may also be accessed at:The IDES timeline is very rigid so you must ensure you are timely with each of these documents since only 7 (seven) days has been allotted within the MEB timeline to complete the IMR/Rebuttal process. You may request an extension, however it must be presented in writing to the PEBLO before surpassing the suspense date.30 Jan 24 - NARSUM from both PCM and Mental Health sent to PEBLO ("Do not retain" from both) w/2 more DQ conditions. 1 Feb 24 - Case sent to AFPC for fitness determination. 14 Feb 24 - FL4 approved, full MEB required for both MH and PH. 15 Feb 24 - Emailed by VA MSC to initiate records review.IDES/MEB TIMELINE. Hey everyone, I'm U.S. Army AD. This forum was very instrumental to me throughout the entire IDES process, so I figured that sharing my timeline may help answer someone's question (s) with regards to IDES/MEB/VA timeline and process. TIMELINE: 12/18/2018 - MEB initiated with three P3 profiles 12/20/2018 - … MEB Timeline so far. Medboard/IDES. 10 Aug2022- Sent to AFPC 12 Aug 2022- Full MEB notification 12 Aug 2022- Peblo brief 16 Aug 2022- Contact with VA rep 19 Aug 2022- Exams scheduled 31 Aug 2022- First Exam Mental Health 2 Sep 2022- Audiology 6 Sep 2022- Optometry 12 Sep 2022- Final exam (head to toe) 11 Oct 2022- All results are posted in ... Describe the MEB process. As a servicemember’s recovery phase reaches the final stages, the first step in the medical discharge process is the MEB. The MEB starts once a servicemember reaches their optimum medical care or when the military doctors decide, even with further medical treatment, the servicemember cannot return to duty.Last Updated: July 11, 2023. The Medical Evaluation Board (MEB) is a process designed to determine whether a Service member’s long-term medical condition enables him/her to continue to meet medical retention standards, in accordance with military service regulations.The Integrated Disability Evaluation System (IDES) combines both the DoD and the VA disability systems into one streamlined process to ensure that service members are able … Meb timeline, 1982. 1 January – The strength of the armed forces was 2,093,032, of which 190,039 were Marines. 5 January – An auditorium used for weapons and tactics instructor training at Marine Corps Air Station (MCAS), Yuma was named in …, Good morning PEB Forums members, Below is my updated MH timeline. 19 Oct 20: Referred for MEB (Psychiatrists referral) - Chronic - PTSD/Unspecified Bipolar/Social Phobia. 19 Oct 20: Initial meeting w/Peblo. 20 Oct 20: AF 469 Code 31 change to Code 37. 4 Nov 20-11 Nov 20: Stay at inpatient Hospital updated diagnosis - Chronic -PTSD/BPAD (Mixed ..., Your primary care doctor recommends a Medical Evaluation Board (MEB). Your case is referred to and evaluated by a Medical Board Physician who initiates a permanent profile if warranted. If a permanent 3 or 4 level profile is issued the Soldier will be contacted by a Physical Evaluation Board Liaison Officer (PEBLO)., Apr 11, 2024 · I just wanted to share my full timeline, since this site has helped me out quite a bit. Reason: Mental health/back pain Code 37 applied - 27 Aug 23 MH NARSUM complete - 18 Oct 23 IRILO with PCM - 7 Nov 23 CIS Signed (Do Not Retain) - 8 Nov 23 Medical NARSUM complete - 28 Nov 23 Full MEB (AFPC) notification - 4 Dec 23 Meeting with PEBLO - 6 Dec ... , Member MEB Rebuttal Letter Impartial TREATMENT PHASE Medical Review 7 DAYS MBR decision to accept or appeal IPEB decision. 6 DAYS IPEB Proposed Decision. 5 DAYS Informal Physical Evaluation Board (IPEB) 11 DAYS Proposed VA rating 15 DAYS Orders and Outprocessing Permissive TDY and Terminal Leave SERVICE MEMBER …, IDES Timeline The IDES is used by the DoD to determine whether RSMs are able to continue to serve. The IDES has four phases: Medical Evaluation Board (MEB), Physical Evaluation Board (PEB), Transition, and VA Disability Compensation Benefits Phase totaling 230 days. , MEB Timeline. Thread starter Veritas1382; Start date Feb 11, 2018; Tags case timelines irilo meb V. Veritas1382 New Member. Registered Member. Feb 11, 2018 #1 Hello All, This is my first post and I thought I would share where I am with the process so far. I have had 3 back surgeries over the past 8 months., Free Online Timeline Maker: Look Professional With A Few Clicks. Create Your Timeline It’s free and easy to use. Professional templates and powerful features for advanced visualization. Create timelines for project management, company history and more. Lines, shapes, icons and other design elements to decorate your timeline., 30 Jan 24 - NARSUM from both PCM and Mental Health sent to PEBLO ("Do not retain" from both) w/2 more DQ conditions. 1 Feb 24 - Case sent to AFPC for fitness determination. 14 Feb 24 - FL4 approved, full MEB required for both MH and PH. 15 Feb 24 - Emailed by VA MSC to initiate records review., Anyways, here is my MEB Timeline: 02/21/2022: Hip Injury occurred during training. 03/16/2022: Hip Surgery Urgent Hip Pinning Surgery due to femoral neck fracture Grade 3B (hip fracture over 50%) Crutches and no weight bearing. -Sent home on Convalescent leave for 1 month -Returned to OCS HHC Fort Benning barracks mid April., If you are in need of differential repair, you may be wondering how long the process will take. The answer can vary depending on several factors, including the severity of the dama..., Apr 11, 2024 · I just wanted to share my full timeline, since this site has helped me out quite a bit. Reason: Mental health/back pain Code 37 applied - 27 Aug 23 MH NARSUM complete - 18 Oct 23 IRILO with PCM - 7 Nov 23 CIS Signed (Do Not Retain) - 8 Nov 23 Medical NARSUM complete - 28 Nov 23 Full MEB (AFPC) notification - 4 Dec 23 Meeting with PEBLO - 6 Dec ... , Feb 6, 2020 · MEB timeline for USAF hickam AFB. Thread starter Shellyhill11; Start date Feb 6, 2020; S. Shellyhill11 Member. PEB Forum Veteran. Registered Member. Feb 6, 2020 #1 , Timeline: MEB Referral: 4/22/21 VA claim: 4/29/21 Med Exam: Complete all C&P exams on 5/21/21 NARSUM Completed: 6/3/21 MEB: 6/8/21 IPEB: In process VA ratings: In process at preparation for decision as of 6/3/21 Claims: Lumbar Degenerative Arthritis, intervertebral disc syndrome (Unfit), 1982. 1 January – The strength of the armed forces was 2,093,032, of which 190,039 were Marines. 5 January – An auditorium used for weapons and tactics instructor training at Marine Corps Air Station (MCAS), Yuma was named in …, July 31 QTC. August 4 all exams were received by MSC. August 6 MEB clinic calls to confirm NARSUM appointment. August 7 NARSUM appointment/ Signed NARSUM. August 14 received unfit memo. September 02 Received DA 199 20% DoD 90% VA, Signed 199. September 11 name on TRANSPROC., 10 Aug2022- Sent to AFPC 12 Aug 2022- Full MEB notification 12 Aug 2022- Peblo brief 16 Aug 2022- Contact with VA rep 19 Aug 2022- Exams scheduled 31 Aug 2022- First …, 1. Elect to not have an IMR nor submit a rebuttal letter to the MEB and allow the case to be forwarded to the IPEB. 2. Submit a Rebuttal Letter to the MEB findings, in which you may disagree with a narrative summary or MEB recommendations, or present extenuating circumstances. You will have five (5 days to submit your letter., MY MEB timeline 6/5/19 x2 P3 profiles signed for Broken hip and PTSD 7/3/19 Met with PEBLO initial brief MEB initiated 8/9/19 Last C&P EXAMs complete 8/25/19 finding from exams sent to PEBLO, found unfit for …, A: The IDES timeline goal is 180 calendar days from the date of profile approval to the date of separation. This does not include any amount of administrative absences or accrued leave that is authorized during the Transition Phase. , Whether you’re a history buff or simply curious about the origins of your home, knowing its construction date can provide valuable insights into its history and character. From arc..., 1982. 1 January – The strength of the armed forces was 2,093,032, of which 190,039 were Marines. 5 January – An auditorium used for weapons and tactics instructor training at Marine Corps Air Station (MCAS), Yuma was named in …, 27 JAN 10 - Sent to PEB Ft. Sam Houston San Antonio, TX. 05 MAR 10 - Received PEB DA 199 w/ results PDRL w/ 30% overall rating (going to appeal/request Formal Hearing) 08 MAR 10 - Meet with the Ft Bliss MEB Legal Outreach attorney to review my DA 199 & review the two issues that I have with it below., MEB Timeline. Thread starter Disgruntledmebenjoyer; Start date Mar 14, 2023; Tags air force peb timeline D. Disgruntledmebenjoyer New Member. Registered Member. Mar 14, 2023 #1 18 April 22: Notified of full MEB decision/start by IRILO ; 31 May 22: All VA C&P Exams completed; 8 August 22: Initial package sent to PEB ..., Here are just a few reasons why this update is important for anyone undergoing the PEB process to review and understand: 1. In this update, there is a provision that allows service members to specifically demand that the FPEB cannot seat as board members anyone who participated in the adjudication process of your case at the …, The Old Testament begins with the creation of Adam and Eve around 4000 B.C. and ends when Nehemiah rebuilds the wall in Jerusalem in 444 B.C. Significant figures in the Old Testame..., The Old Testament begins with the creation of Adam and Eve around 4000 B.C. and ends when Nehemiah rebuilds the wall in Jerusalem in 444 B.C. Significant figures in the Old Testame..., A Medical Evaluation Board (MEB) is a reality that any Airman can face at any point during his or her career. An MEB is just one component of an overall system known as the Air Force Integrated Disability Evaluation System (IDES). IDES is in place to ensure not only a fit force, but the safety and well-being of all members., IDES/MEB TIMELINE. Hey everyone, I'm U.S. Army AD. This forum was very instrumental to me throughout the entire IDES process, so I figured that sharing my timeline may help answer someone's question (s) with regards to IDES/MEB/VA timeline and process. TIMELINE: 12/18/2018 - MEB initiated with three P3 profiles 12/20/2018 - …, May 7, 2024. #2. I’d call the VA benefits hotline 1-2 times a week and ask for the “status of your claim”. Depending on their answer, you’ll know which of the 8 steps to a VA claim you’re at. From my claim only a few weeks ago, once it hit the “Decision Phase” I was contacted by the PEBLO in the next few days to sign the 618., I just wanted to share my full timeline, since this site has helped me out quite a bit. Reason: Mental health/back pain Code 37 applied - 27 Aug 23 MH NARSUM complete - 18 Oct 23 IRILO with PCM - 7 Nov 23 CIS Signed (Do Not Retain) - 8 Nov 23 Medical NARSUM complete - 28 Nov 23 Full MEB (AFPC) notification - 4 Dec 23 Meeting with PEBLO - 6 Dec ..., State begins MEB process: 10/2022 MEB timeline: State initiates MEB process: 10/2022 MEB packet sent forward: 11/2022 PEBLO contact: 01/2023 Will continue to update. Reactions: chaplaincharlie and Provis. N. New Member Well-Known Member. PEB Forum Veteran. Registered Member. Joined Nov 17, 2022 Messages 115., The MEB phase has an officially published DoD timeline of 100 calendar days for Active Component (AC) military personnel and 140 calendar days for Reserve Component (RC) military personnel.